Who We Are
Onterris is a global environmental solutions company partnering with organizations to solve complex challenges where environmental pressures, regulatory expectations and operational risks intersect.
Sectors
Access deep environmental expertise tailored to your industry, with solutions built for real-world conditions.
Solutions
Prepare for escalating environmental risks with expert solutions designed to perform under pressure.
Our Thinking
Explore briefs, perspectives and articles that turn insight into action. Discover thought leadership that informs decisions and drives impact. See the ideas shaping environmental solutions and guiding your next move.
Cuture & Careers
Where brilliant people come together to turn environmental science into real-world progress for communities, industry and the planet.

From Contaminated Land to Community Sports Complex

Transforming South Garaches Lane into a safe and vibrant hub for Wilmington families

Aerial view of park construction site with heavy equipment, pathways, and playground installation in progress

Highlights

5,000+

cubic yards of soil removed: Contaminated material safely excavated and disposed of under full regulatory compliance

Hundreds of thousands

of gallons dewatered: Impacted groundwater managed with precision under municipal permit

5

HSCA sites remediated: DNREC criteria fully met, paving the way for safe redevelopment

A proactive response to a legacy of contamination

For decades, the South Garaches Lane site in Wilmington, Delaware, carried the imprint of heavy industrial use. Railroad easements and auto salvage yards dating back to the 1940s left behind contamination that exceeded safety standards set by the Delaware Department of Natural Resources and Environmental Control (DNREC). Elevated levels of arsenic, lead and other contaminants posed risks to residents and local ecosystems.

Community leaders envisioned something different: a sports complex that could bring families together and energize the city. To make that vision real, Onterris was asked to assess and remediate the outdoor fields and roadways. Brightfields managed the future field house building area, while Alliance focused on roads, parking lots, and outdoor sports fields. Together, the teams worked toward one goal: transforming a neglected site into a safe, thriving community asset.


Speed, clarity, and care in remediation

Onterris developed a Remedial Action Work Plan (RAWP) that earned DNREC approval and guided every step of the cleanup. A site-specific Health & Safety Plan and Contaminated Materials Management Plan ensured protection for workers and the community.

Monitoring wells, test pits and soil borings mapped contamination across five Hazardous Substance Cleanup Act (HSCA) sites. Laboratory analyses shaped a strategy that included multiple operable units. Contaminated soil was excavated and capped with DNREC-approved materials, while groundwater use was restricted through an Environmental Covenant to safeguard future generations.


Powered by teamwork

The project’s success rested on collaboration. Engineers, project managers, field staff and health and safety specialists worked side by side with DNREC officers, construction managers and the client. Regular planning meetings built trust and enabled quick responses to challenges, from equipment emergencies to hazardous material disposal.

We weren’t just cleaning up land. We were building the foundation for a place where families can gather, play, and grow together.
Project Engineer at Onterris

A lasting impact for Wilmington

The result is the Chase Fieldhouse, a state-of-the-art complex that now hosts the Delaware Blue Coats NBA G League team and the Titus Sports Academy. With indoor and outdoor facilities, the complex has become a cornerstone for Wilmington, offering opportunities for recreation, connection and pride.

This transformation demonstrates how environmental stewardship, technical expertise, and teamwork can turn contaminated land into a community asset. The Chase Fieldhouse project is more than remediation. It is a model of sustainable redevelopment and a reminder of what’s possible when people move together toward one goal.

Explore Related Content

California Proposition 45: Proposed Changes to CEQA Review for Qualifying Development Projects

The November ballot measure would amend the California Environmental Quality Act (CEQA) to establish a new pathway intended to expedite environmental review for qualifying projects, but key implementation questions remain

California El Niño: Regulatory Guidance for Emergency Stream and Channel Work

Prepare for California El Niño impacts with guidance on emergency stream and channel work, regulatory coordination, documentation and response planning.

CERCLA Liability Exemptions for Brownfield Buyers

Learn which CERCLA liability exemptions and defenses may apply to brownfield owners, and why due diligence, AAI and documentation still matter.

Ontario O. Reg. 406/19: 2027 Excess Soil Rules

Ontario’s excess soil landfill restriction takes effect Jan. 1, 2027. Learn how O. Reg. 406/19 affects reuse planning, QP support and project schedules.

AFFF Transition Is Not Just a Foam Swap

Removing legacy foam without addressing residual contamination, system compatibility and waste management creates serious operational and environmental risks long after the changeout is complete

Odor Complaints Need Chemistry

Odor complaints often begin with someone reporting a smell in the environment: rotten eggs, chemical-like or something foul

Why Consistent Implementation Is the Real Test of Disaster Recovery Policy

U.S. GAO report demonstrates how inconsistent implementation can undermine disaster recovery programs

Keeping Sydney Metro West Tunnelling On Track With Audit-Backed Environmental Delivery

A multi-site investigation, remediation and validation program aligned with NSW EPA accredited Site Auditor review cycles enables construction teams to progress safely and confirm site suitability

Strengthening PFAS Data Integrity Through Stage 4 Data Validation

Rigorous data review can uncover issues that summary reports do not show, protecting data integrity across the project lifecycle

Critical Thinking in Data Validation: How Small Errors Can Have Big Impacts

Critical thinking and professional judgment help uncover small data issues before they become costly project risks