Who We Are
Onterris is a global environmental solutions company partnering with organizations to solve complex challenges where environmental pressures, regulatory expectations and operational risks intersect.
Sectors
Access deep environmental expertise tailored to your industry, with solutions built for real-world conditions.
Solutions
Prepare for escalating environmental risks with expert solutions designed to perform under pressure.
Our Thinking
Explore briefs, perspectives and articles that turn insight into action. Discover thought leadership that informs decisions and drives impact. See the ideas shaping environmental solutions and guiding your next move.
Cuture & Careers
Where brilliant people come together to turn environmental science into real-world progress for communities, industry and the planet.

AFFF Transition Is Not Just a Foam Swap

Removing legacy foam without addressing residual contamination, system compatibility and waste management creates serious operational and environmental risks long after the changeout is complete

A close-up view of fluffy white foam or bubbles spread across a surface.
Cullen Flanders
Cullen Flanders Cullen Flanders
Emerging Contaminants Market Leader
Patrick McKeown
Patrick McKeown Patrick McKeown
Business Development Manager

Key takeaways

  • Residual PFAS stays trapped in the system: Tanks, piping, pumps, hoses, nozzles and proportioning equipment continue releasing per- and polyfluoroalkyl substances (PFAS) even after you drain the original aqueous film-forming foam (AFFF)
  • Replacement foam requires system modifications: Fluorine-free foams (F3) have distinct viscosity, flow and application profiles that require compatibility reviews, equipment upgrades and full recommissioning
  • Transition water needs a clear plan before work starts: Decontamination generates concentrated PFAS waste streams that require rigorous characterization, containment, treatment and defensible final disposition

AFFF replacement and PFAS decontamination: removing concentrate is only step one

An effective AFFF transition spans fire protection, environmental compliance, ongoing operations and waste management. AFFF transition means removing legacy aqueous film-forming foam, decontaminating PFAS-impacted system components, managing transition waste and converting the system to a suitable replacement foam.

When that replacement is fluorine-free foam (F3), the fluorine-free foam transition may also require compatibility reviews, equipment modifications, performance testing and recommissioning. A successful AFFF replacement or AFFF conversion must address these interconnected requirements rather than treating the project as a simple foam swap.

Legacy foam penetrates deep into equipment surfaces and lingers inside complex suppression infrastructure. Research on aircraft rescue and firefighting (ARFF) vehicle cleanouts showed that standard three-stage water rinses experienced a 28% PFAS rebound after 12 days and 50% after 33 days. By contrast, a proprietary clean-in-place process contained rebound to less than 2% after 33 days.

Source: Onterris

This rebound directly threatens your investment: residual PFAS contaminates fresh replacement foam, creates ongoing waste liabilities during routine maintenance and defeats the core purpose of the transition. Onterris manages changeouts through a tightly controlled framework covering assessment, decontamination, waste handling, system modification and safe return to service.


AFFF system decontamination: plan around the full suppression system

Facility managers should evaluate the full suppression footprint before choosing a transition pathway. This includes vehicle-mounted systems, storage tanks, piping networks, hydrants, pumps, proportioners, nozzles and discharge hardware.

Source: Onterris

Shifting foam chemistries directly impacts hydraulic performance. Depending on the installation, engineering teams must evaluate:

  • Foam and equipment chemical compatibility
  • Proportioning accuracy and system hydraulics
  • Required nozzle, pump or piping modifications
  • Updated functional testing and acceptance criteria
  • Revised operator training and emergency response protocols
  • Phased transition sequencing and temporary fire protection coverage

These steps are critical for high-consequence environments like aircraft hangars, refineries, chemical processing plants and bulk fuel terminals where downtime is not an option.


AFFF transition waste management: treat PFAS waste as a design decision

System cleanout produces spent concentrate, active wash fluids and dirty rinse water. The total volume and chemical makeup of these streams help determine which PFAS treatment technologies or off-site waste-management approaches provide the most cost-effective, compliant pathway.

  • Volume & Cost Reduction: On one recent AFFF project, on-site treatment slashed the off-site waste volume to less than 4% of original projections, delivering over 50% total cost savings while treating water down to non-detect levels across 24 analyzed PFAS compounds
  • Treatment Efficiency: Testing on airport transition wastewater highlighted clear performance gaps among technologies. Standard granular activated carbon (GAC) and ion exchange (IX) beds left PFOS and 6:2 FTS concentrations in the hundreds of nanograms per liter (ng/L). Implementing an advanced treatment train with AvPure drove total PFAS below 15 ng/L in a single pass

Action items for AFFF decision-makers

  1. Define operational constraints: Establish required fire protection coverage and acceptable outage windows.
  2. Conduct a full system audit: Inventory every component that has ever come into contact with AFFF.
  3. Set clear benchmarks: Define decontamination goals and PFAS testing and analysis criteria before mobilizing.
  4. Plan for waste: Characterize anticipated waste volumes and map out disposal limits in advance.
  5. Verify compatibility: Evaluate replacement foam mechanics and engineer necessary hardware upgrades.
  6. Execute an integrated plan: Combine cleanout, water treatment, verification testing and recommissioning into a single timeline.

Bottom Line: AFFF transition succeeds only when the system returns to service clean, compatible and ready to perform. Treating this as a routine product swap leaves unacceptable risk behind.

Explore Related Content

Data Centres on Contaminated Land: What Developers in Australia Need to Consider

As Australian state policies steer data centres toward former industrial sites, understand what contamination means for brownfield site selection, approvals and long-term liabilities

Advancing PFAS Removal and Destruction at a Municipal Wastewater Treatment Plant with FOAM-X

Peer-reviewed research published in ACS ES&T Water demonstrates how FOAM-X removes and concentrates PFAS from municipal wastewater to enable downstream destruction

Why Pharma Manufacturers Need Treatment Strategies Built for Emerging Constituents

Future-ready wastewater treatment starts with knowing what’s in the stream, targeting priority constituents and building flexibility into the treatment train

Why Smarter Remediation Starts with Understanding Risk

Understanding actual site risks helps environmental professionals make smarter cleanup decisions, focus resources where they matter most and deliver lasting protection

Can You Trust the Environmental Data Behind Your Next Decision?

Eight questions for chemical and industrial environmental compliance leaders to pressure-test environmental data evidence before the next reporting, permitting or planning decision

What Makes an Effective Industrial Hygiene Program?

From identifying workplace hazards to verifying controls, a structured industrial hygiene program helps facilities prioritize risks and make informed safety decisions

From Data Centers to Global LNG Markets: The Growing Role of Certified Natural Gas

As buyers seek greater emissions transparency, verified methane performance is becoming a commercial consideration for natural gas suppliers and an increasingly important factor in the future of energy markets

Five Fundamentals of a World-Class Methane Management Program

Connecting defensible data, targeted measurement and operational practices to manage emissions and improve performance

California Proposition 45: Proposed Changes to CEQA Review for Qualifying Development Projects

The November ballot measure would amend the California Environmental Quality Act (CEQA) to establish a new pathway intended to expedite environmental review for qualifying projects, but key implementation questions remain

Turning Methane Data into Better Operational and Business Decisions

Using defensible methane data to prioritize action, improve performance and demonstrate value