Who We Are
Onterris is a global environmental solutions company partnering with organizations to solve complex challenges where environmental pressures, regulatory expectations and operational risks intersect.
Sectors
Access deep environmental expertise tailored to your industry, with solutions built for real-world conditions.
Solutions
Prepare for escalating environmental risks with expert solutions designed to perform under pressure.
Our Thinking
Explore briefs, perspectives and articles that turn insight into action. Discover thought leadership that informs decisions and drives impact. See the ideas shaping environmental solutions and guiding your next move.
Cuture & Careers
Where brilliant people come together to turn environmental science into real-world progress for communities, industry and the planet.

California El Niño: Regulatory Guidance for Emergency Stream and Channel Work

California public agencies can prepare now for potential El Niño impacts by knowing their vulnerable sites, monitoring changing conditions and understanding the regulatory path for emergency work

Flooded street with mountain.
Ken Schwarz
Ken Schwarz Ken Schwarz
Managing Principal, Consulting
Bridget Lillis
Bridget Lillis Bridget Lillis
Director, Consulting

Key takeaways

  • Prepare for a potentially historic storm season: A very strong El Niño could increase the potential for flooding, erosion and impacts to streams, channels and related infrastructure, although conditions will vary across California
  • Use the time before storms to get ready: Identify vulnerable sites, establish monitoring and decision procedures, document baseline conditions and develop a plan for potential emergency work
  • Know what to do when emergency work is needed: Document changing conditions and actions taken, coordinate with the appropriate regulatory agencies and understand how California’s emergency measures may affect regulatory pathways and response options

California is preparing now for a potentially historic storm season

California is moving into this year’s winter season with clear signals to prepare early. The National Oceanic and Atmospheric Administration (NOAA) reports a greater than 90% chance of a very strong El Niño during the Northern Hemisphere fall and winter 2026–2027.

For public agencies responsible for streams, flood channels and related infrastructure, periods of heavy rain can create conditions that require rapid action, including flooding, erosion, debris flows and damage to infrastructure.

On September 21, Governor Gavin Newsom declared a state of emergency to mobilize state resources ahead of the super El Niño storm season. The action directs state environmental and natural resource agencies to assist local preparedness efforts through expedited permitting and other regulatory coordination.


Planning that supports rapid and compliant emergency response

Emergency conditions leave little time to establish documentation procedures and how to coordinate the regulatory response.

Before storms arrive, agencies can strengthen readiness through five practical steps:

Source: Onterris

These steps create a stronger foundation for planning, preparedness, response and recovery, helping teams recognize when conditions have materially changed and providing context for decisions made under emergency conditions.


Understand the water resources permitting pathways too

Emergency stream and channel work can involve several regulatory agencies when it comes to water resources permitting and compliance. Depending on the location and work proposed, agencies may need to coordinate with the U.S. Army Corps of Engineers (USACE) for qualifying emergency repair and protection activities, the Regional Water Quality Control Board (RWQCB) for water-quality requirements and the California Department of Fish and Wildlife (CDFW) for work affecting streams and wildlife resources.

The specific process varies by agency and circumstance, but the core approach is consistent: communicate early, provide appropriate notification, minimize environmental impacts, document the work and complete required follow-up.

California’s September 21 state of emergency adds an important consideration. The proclamation directs state environmental and natural resource agencies to fast-track permitting and identify ways to support local flood, landslide and debris-flow preparedness.

That does not mean environmental requirements have broadly been waived. It does mean agencies have an opportunity to clarify potential regulatory pathways, contacts and responsibilities before an emergency requires immediate action.


When an emergency occurs, build the record as you respond

If conditions require emergency work, documentation is key.

That record may include:

  • Conditions that initiated the emergency response, e.g. a stream bank caved in or high flows
  • Work footprint and site access
  • Actions performed and relevant quantities
  • Pre- and post-work photographs
  • Measures used to avoid or minimize environmental impacts

Early regulatory coordination remains important. Notifications, authorizations and follow-up requirements differ among USACE, RWQCB and CDFW, making it valuable to know in advance who will manage those communications.


Preparedness creates options when time is limited

Emergency repairs may address the immediate threat without representing the site’s permanent condition. After the immediate response, agencies may need to evaluate additional recovery, such as ecological restoration and nature-based solutions that support longer-term site stability, ecosystem function and resilience.

Preparedness is straightforward: Know the vulnerable sites. Know the triggers. Know the regulatory pathway. Know who will coordinate the response.

Onterris brings together water resources expertise, environmental permitting know-how and strong regulatory relationships to help public agencies plan before conditions change and navigate regulatory coordination when emergency work becomes necessary.

PREPARING FOR POTENTIAL EMERGENCY STREAM OR CHANNEL WORK THIS STORM SEASON?

Connect with an Onterris environmental specialist to discuss site risks, regulatory strategy and emergency planning.

Explore Related Content

Landfill Gas Is the Ultimate Test of Environmental Maturity

Elevated landfill methane emissions can signal more than a gas problem. Learn how operators can connect methane data with liquids, cover and site operations.

Rebuilding Highway 8 for a Changing River

See how Onterris helped rebuild Highway 8 along the Nicola River with climate-resilient bridge design, hydrotechnical engineering and habitat enhancements.

California SB 1137: Why Early Planning is Crucial for Oil and Gas Operators

Learn how California oil and gas operators can prepare for SB 1137 with early sampling, air dispersion modeling, EDS planning and a defensible LDRP.

CO₂ Loss in Bottling Plants: Find Leaks with OGI

See how bottling plants can detect and quantify CO₂ leaks with optical gas imaging, prioritize repairs by cost and reduce avoidable gas loss.

CERCLA Liability Exemptions for Brownfield Buyers

Learn which CERCLA liability exemptions and defenses may apply to brownfield owners, and why due diligence, AAI and documentation still matter.

Ontario O. Reg. 406/19: 2027 Excess Soil Rules

Ontario’s excess soil landfill restriction takes effect Jan. 1, 2027. Learn how O. Reg. 406/19 affects reuse planning, QP support and project schedules.

Early Environmental Planning for Infrastructure Projects

Learn how early environmental planning helps infrastructure teams manage compliance risk, permitting, costs and schedules before construction begins.

Odor Complaints Need Chemistry

Odor complaints often begin with someone reporting a smell in the environment: rotten eggs, chemical-like or something foul

Why Consistent Implementation Is the Real Test of Disaster Recovery Policy

U.S. GAO report demonstrates how inconsistent implementation can undermine disaster recovery programs

Keeping Sydney Metro West Tunnelling On Track With Audit-Backed Environmental Delivery

A multi-site investigation, remediation and validation program aligned with NSW EPA accredited Site Auditor review cycles enables construction teams to progress safely and confirm site suitability