Who We Are
Onterris is a global environmental solutions company partnering with organizations to solve complex challenges where environmental pressures, regulatory expectations and operational risks intersect.
Sectors
Access deep environmental expertise tailored to your industry, with solutions built for real-world conditions.
Solutions
Prepare for escalating environmental risks with expert solutions designed to perform under pressure.
Our Thinking
Explore briefs, perspectives and articles that turn insight into action. Discover thought leadership that informs decisions and drives impact. See the ideas shaping environmental solutions and guiding your next move.
Cuture & Careers
Where brilliant people come together to turn environmental science into real-world progress for communities, industry and the planet.

Canada’s Landfill Methane Rules: Knowing When Costs Hit Your Site

Knowing where a landfill site sits on its methane generation curve helps municipalities plan for near-term reporting costs and future capital investment

Wild recycling center in nature with burying of waste.
Carter Morrison
Carter Morrison Carter Morrison
Business Development Manager

Two landfills can fall under Canada’s Landfill Regulations (SOR/2025-279) and face very different budgets. One may be dealing primarily with annual modelling and reporting. Another may be preparing for a methane-control investment and the monitoring obligations that come with it.

Their budgets diverge because each site sits at a different point on its methane generation curve and regulatory calendar.

Generic compliance-cost estimates are rarely useful without that context. The better starting point is knowing what applies to the landfill today, when the next requirements take effect and how many budget cycles sit in between.

The methane generation curve tells a municipality more about future cost than a generic compliance estimate.


Costs arrive in stages

In practice, landfill methane compliance costs tend to appear in three stages.

Annual modelling and reporting comes first. The Landfill Methane Regulations apply to landfills that meet defined waste-in-place and disposal thresholds. This includes sites with more than 450,000 tonnes of waste in place that received waste after January 1, 2010, as well as sites that dispose of more than 20,000 tonnes in a calendar year beginning in 2025 and hold more than 200,000 tonnes in place.

Captured sites calculate annual methane generation using Environment and Climate Change Canada’s landfill methane modelling tool and report by June 1 for the preceding calendar year. For an open landfill below 664 tonnes per year, this can remain the main near-term compliance cost. Under section 4 of SOR/2025-279, the annual assessment requirement ceases after the required reporting when an open landfill reaches 664 tonnes or more, or when the landfill closes.

Planning and compliance preparation enters the picture as the generation curve approaches a control threshold. Feasibility, system design, permitting, procurement and capital planning become relevant well before construction begins.

Ongoing operation and monitoring follows once control obligations apply. Depending on the site, the work includes wellfield monitoring, surface methane surveys, equipment leak monitoring, repairs, reporting and recordkeeping. This is a recurring operating commitment with staffing and contractor costs attached to it.

Those are materially different budget needs. Combining them into one compliance number makes it harder to distinguish what needs funding now from what needs to be planned for later.


A captured site can still be years from control

Being subject to the Regulations does not automatically mean facing an immediate methane-control capital project.

For an open landfill, further control requirements are tied to modelled methane generation of 664 tonnes per year or more. For a closed landfill, the threshold is 1,000 tonnes per year.

For sites generating 1,000 tonnes or more of methane per year, the earliest control date is January 1, 2028. That date applies where an active landfill gas recovery system was already operating when the Regulations came into force. Sites without an operating system generally move into the sections 7 through 24 requirements on January 1, 2029, or January 1 of the fourth year after the threshold was calculated, whichever comes later. Registered offset projects can extend that timeline.

Open landfills generating between 664 and 999 tonnes per year have more runway. Their control date is generally January 1, 2035, or January 1 of the fourth year after the threshold was calculated if that date falls later.

A landfill modelling at 700 tonnes per year today therefore has a very different planning horizon from one already above 1,000 tonnes.

ECCC’s national cost analysis models the same concentration of spending around major regulatory milestones. It estimates incremental industry and government compliance costs of about $318 million in 2028 and $184 million in 2029.

Those figures are not budgets for individual municipalities. They do show that compliance spending is expected to cluster around the dates when sites move into more capital-intensive requirements.

Being captured by the regulation and facing an immediate capital project are not the same thing.


Runway is the asset

In ECCC’s national analysis, capital is the largest compliance-cost category.

ECCC estimates capital investment will account for $614 million of the $794 million in total present-value industry compliance costs from 2026 through 2040. Roughly three-quarters of the estimated industry cost sits in capital rather than monitoring, operations or administration.

For municipalities approaching a control date, the years before that investment are valuable.

A longer planning window gives engineers time to size a system against the landfill’s expected methane generation rather than a compressed construction schedule. Procurement can proceed on a normal timetable. The project can enter the municipal capital cycle early enough to be phased across budget years or considered alongside available funding programs.

There is also more room to work through permitting and other dependencies before they begin to dictate the schedule.

SOR/2025-279 does provide a limited deferral mechanism for the control date set under subparagraph 5(2)(a)(ii). The Minister may defer that date by up to two years when an operator cannot comply because of circumstances beyond its control arising from an outstanding provincial or territorial permit or approval, or delayed procurement, delivery or installation of necessary equipment.

That provision is a backstop for circumstances a municipality cannot control. It does not replace the value of having time in the first place.


The curve keeps moving

A landfill’s position under the Regulations is not fixed.

Waste accumulates, portions of the site close and methane generation rises and eventually declines. The Regulations also contain provisions that allow certain obligations to end when defined conditions are met, including for qualifying areas that have been closed and covered for at least 15 years and for some sites where methane generation or recovery has fallen below specified levels.

The annual assessment requirement itself does not continue indefinitely under SOR/2025-279. But the generation profile developed through modelling still gives municipalities an early view of when the cost picture is likely to change.

Viewed as a curve, it shows where a landfill is heading.

A site below its methane generation threshold may have little near-term cost beyond modelling and reporting. As the curve approaches a threshold, design and capital planning begin to matter. Once control requirements take effect, monitoring and system operation become recurring expenses.

The number changes, but so does the type of cost attached to it.

Source: epa.nsw.gov.au


What that means for the budget cycle

Before a municipality locks in a landfill methane budget, three things should be clear:

  1. Whether the Regulations apply to the site
  2. Where current modelled methane generation sits
  3. When the next control date is expected to arrive

Those answers separate the annual operating requirement from a future capital commitment.

They also give council a more useful way to look at the investment. A gas collection system that may be required several budget cycles from now belongs in a different conversation from this year’s modeling and reporting costs.

As annual modeling builds a longer site-specific record, municipalities will have a clearer view of when that conversation needs to change.

The useful output is not only this year’s methane number. It is the distance between that number and the next capital decision.

Once the curve is visible, that decision has a date.

PREPARE FOR UPCOMING LANDFILL METHANE REQUIREMENTS

Talk with an Onterris landfill expert to prepare for upcoming methane regulations, identify monitoring needs and prioritize investments that improve site performance.

Explore Related Content

Five Fundamentals of a World-Class Methane Management Program

Connecting defensible data, targeted measurement and operational practices to manage emissions and improve performance

Landfill Gas Is the Ultimate Test of Environmental Maturity

Elevated landfill methane emissions can signal more than a gas problem. Learn how operators can connect methane data with liquids, cover and site operations.

CERCLA Liability Exemptions for Brownfield Buyers

Learn which CERCLA liability exemptions and defenses may apply to brownfield owners, and why due diligence, AAI and documentation still matter.

When Landfills Run Hot: Why Leachate Strategy Matters

Learn how elevated temperature landfills can change leachate chemistry, treatment needs and costs and why early characterization and contingency planning matter.

Ontario O. Reg. 406/19: 2027 Excess Soil Rules

Ontario’s excess soil landfill restriction takes effect Jan. 1, 2027. Learn how O. Reg. 406/19 affects reuse planning, QP support and project schedules.

Building Environmental Certainty Before Shovels Hit the Ground

Early environmental insight helps project teams manage compliance risk, use resources more efficiently and build greater cost and schedule certainty into project delivery

California AB 28 Becomes Law: What Landfill Operators Need to Prepare for

New notification, investigation and corrective action requirements create a statewide framework for identifying and managing subsurface elevated temperature events at certain California landfills.

Flexible Modular Leachate Treatment for Greater Operational Control

Integrated engineering and full-service operations provides an adaptable treatment pathway for changing site conditions and evolving requirements

AFFF Transition Is Not Just a Foam Swap

Removing legacy foam without addressing residual contamination, system compatibility and waste management creates serious operational and environmental risks long after the changeout is complete

The Industrial Wastewater Paradigm Shift: From Treatment to Resource Recovery

Why forward-thinking industries are transforming wastewater from a compliance cost into a strategic source of water, energy and valuable materials