Who We Are
Onterris is a global environmental solutions company partnering with organizations to solve complex challenges where environmental pressures, regulatory expectations and operational risks intersect.
Sectors
Access deep environmental expertise tailored to your industry, with solutions built for real-world conditions.
Solutions
Prepare for escalating environmental risks with expert solutions designed to perform under pressure.
Our Thinking
Explore briefs, perspectives and articles that turn insight into action. Discover thought leadership that informs decisions and drives impact. See the ideas shaping environmental solutions and guiding your next move.
Cuture & Careers
Where brilliant people come together to turn environmental science into real-world progress for communities, industry and the planet.

Long-Term Housing Planning Is Key to Successful Disaster Recovery

Housing decisions shape recovery long before rebuilding begins

Aerial view of storm damaged neighborhood with homes covered in blue tarps and debris after severe weather
Christa Lopez, Ph.D., CEM
Christa Lopez, Ph.D., CEM Christa Lopez, Ph.D., CEM
Senior Advisor, Government Relations

Disaster housing recovery is often framed as an emergency shelter issue. That is too narrow. Housing is the foundation of community stability, and when recovery plans focus only on immediate placement, families can remain displaced long after the headlines fade.

The pressure on recovery systems is increasing. The U.S. Government Accountability Office reported that the country experienced 27 disasters causing more than $1 billion in damage in 2024, up from 14 in 2018. At the same time, dozens of federal entities play a role in disaster recovery, each with different programs and requirements. That combination of rising disaster frequency and fragmented delivery helps explain why housing recovery so often moves slower than communities need.

Disaster housing recovery cannot be treated as a short-term transaction. It has to be planned as a long-term community strategy that connects immediate shelter, interim housing and permanent recovery from the start.


Local context should shape every housing decision

No two communities recover the same way. A rural county with limited rental stock faces a different challenge than a coastal city dealing with repeated flood loss. Yet recovery systems still tend to rely on standardized processes that do not always reflect local housing conditions, service capacity or community priorities.

A strong housing strategy starts with local leadership, local data and direct input from the people living through the disruption. When state and federal resources are aligned around community realities rather than imposed on top of them, recovery becomes more practical and more equitable.

The strongest recovery plans are built around how a community actually lives, not around how a program expects recovery to unfold.

Fragmentation slows recovery more than most communities expect

One of the most persistent housing recovery problems is lack of coordination, not lack of effort.

The GAO has repeatedly warned that the federal recovery system is fragmented across dozens of entities. Communities may be dealing with different rules, timelines and documentation standards at the exact moment when residents need a simpler path back to stable housing.

That is why public-private and inter agency partnerships need to be built before a disaster, not during one. Local governments, housing authorities, nonprofits and private partners all influence whether households move efficiently from displacement to stability. If those relationships do not exist ahead of time, delays become part of the recovery process.

HUD-backed research points to the same issue from another angle: housing recovery activities funded through Community Development Block Grant Disaster Recovery (CDBG-DR) averaged 3.8 years to complete. That timeline reflects the complexity of long-term recovery, but it also shows why communities cannot afford to improvise once an event has already happened.


Better data should drive preparedness, not just response

Housing recovery decisions should not be driven by assumptions or by whoever reaches the system first. They should be driven by evidence and translated into preparedness actions before disaster strikes.

Damage assessments, housing market data, geographic information systems and social vulnerability indicators help communities identify where needs are likely to be deepest and which households are most likely to be missed. Gap analysis should be conducted routinely year to year to validate resources against community and economic changes. That information should shape stakeholder engagement and the development of pre-disaster recovery and temporary housing plans, like sourcing manufactured housing units (MHUs).

Preparedness is most effective when it is practiced. Exercises and training help jurisdictions test how housing decisions will be made under pressure, where coordination is likely to break down and what resources will be needed first.

Recovery becomes more effective when leaders use data to plan for the people most likely to be missed.

A practical example I previously assisted with comes from the Houston Urban Area Security Initiative, which convened a recovery planning group to develop a Pre-Disaster Recovery Plan template, a Housing Recovery Support Function Annex template and a Recovery Exercise Package that jurisdiction scan use as a starting point for their own planning efforts. Resources like these matter because they give communities a workable foundation before they need to activate a housing recovery program.


What this means now

Housing recovery should do more than replace what was lost. It should reduce the chance that the same families face the same instability again after the next event.
That means planning has to connect speed with resilience. Communities need housing strategies that reflect future risk, long-term affordability and operational realities, not just immediate replacement needs. The organizations that perform best after a disaster are usually the ones that planned early, built partnerships in advance and treated housing as a core recovery system rather than a single program. That shift matters because in disaster recovery, stable housing is not the final step. It is what makes every other part of recovery possible.

Explore Related Content

Five Fundamentals of a World-Class Methane Management Program

Connecting defensible data, targeted measurement and operational practices to manage emissions and improve performance

California Proposition 45: Proposed Changes to CEQA Review for Qualifying Development Projects

The November ballot measure would amend the California Environmental Quality Act (CEQA) to establish a new pathway intended to expedite environmental review for qualifying projects, but key implementation questions remain

Turning Methane Data into Better Operational and Business Decisions

Using defensible methane data to prioritize action, improve performance and demonstrate value

Landfill Gas Is the Ultimate Test of Environmental Maturity

Elevated landfill methane emissions can signal more than a gas problem. Learn how operators can connect methane data with liquids, cover and site operations.

California El Niño: Regulatory Guidance for Emergency Stream and Channel Work

Prepare for California El Niño impacts with guidance on emergency stream and channel work, regulatory coordination, documentation and response planning.

Rebuilding Highway 8 for a Changing River

See how Onterris helped rebuild Highway 8 along the Nicola River with climate-resilient bridge design, hydrotechnical engineering and habitat enhancements.

California SB 1137: Why Early Planning is Crucial for Oil and Gas Operators

Learn how California oil and gas operators can prepare for SB 1137 with early sampling, air dispersion modeling, EDS planning and a defensible LDRP.

Your Bottling Plant Measures Almost Everything. Why Not CO2 Loss?

Tracking carbon dioxide (CO₂) loss helps plants reduce emissions, prioritize repairs and protect margins

CERCLA Liability Exemptions for Brownfield Buyers

Learn which CERCLA liability exemptions and defenses may apply to brownfield owners, and why due diligence, AAI and documentation still matter.

Ontario O. Reg. 406/19: 2027 Excess Soil Rules

Ontario’s excess soil landfill restriction takes effect Jan. 1, 2027. Learn how O. Reg. 406/19 affects reuse planning, QP support and project schedules.